Maintenance visibility, from PMP forecast to Aircraft Release.
One unbroken workflow connects the planner, line engineer, parts store and quality team. From the PMP forecast to aircraft release, every task stays on one tail timeline.
- [1]
PMP Forecast
Due checks, thresholds, and life-limited items are forecast by tail before the work is due.
- [2]
Planned Maintenance
The planner slots the package against the flying programme, station, and available ground time.
- [3]
Work Package
Task cards open and parts are reserved from inventory before the aircraft is inducted.
- [4]
Maintenance in Work
Engineers carry out the planned work. Findings stay on the same tail timeline.
- [5]
Aircraft Release
Airworthiness release is issued. The tail returns to the active operating fleet.